新聞
山東鍍鋅鐵皮風(fēng)管配管圖繪制準(zhǔn)繩及請求
發(fā)布人:http://hwzxw.net 發(fā)布時(shí)間:2019-07-02 17:39:21
對于山東鍍鋅鐵皮風(fēng)管配管圖繪制準(zhǔn)繩及請求是什么?下面由順發(fā)通風(fēng)管道的人員介紹一下:
For Shandong galvanized iron sheet air duct piping drawing criteria and requirements? Below by the professional personnel of the ventilation pipe to introduce:
1) 配管圖必須標(biāo)示支吊架位置,支吊架位置間距及所有材料規(guī)格必須符后規(guī)范要求及工藝規(guī)定。
1) Piping drawing must indicate the position of support and hanger, and the distance between supports and hanger positions and all material specifications must conform to the requirements of the later specifications and technological requirements.
2) 配管圖應(yīng)標(biāo)示起端與彎頭位置、變徑位置、管線所處軸線位置、管底標(biāo)高。
2) Pipeline drawing shall indicate the position of the beginning and elbow, the position of the diameter change, the position of the axis of the pipeline and the elevation of the bottom of the pipe.
3) 配管圖應(yīng)進(jìn)行編號,從起點(diǎn)開始編號,起點(diǎn)一般為接口位置,相同斷面規(guī)格、相同長度節(jié)為同一號碼,除此應(yīng)按順序編號。以便于組織制作施工。
3) Piping drawings should be numbered, starting from the starting point, the starting point is generally the interface location, the same section size, the same length section is the same number, in addition, they should be numbered in sequence. In order to facilitate the organization of production and construction.
4) 制作配管圖時(shí)應(yīng)優(yōu)先考慮彎頭與變徑滿足內(nèi)外表面同心彎管要求、變徑長度要求。
4) The elbow and diameter change should be given priority to satisfy the requirements of concentric elbow on inner and outer surface and length of diameter change when making piping drawing.
山東鍍鋅鐵皮風(fēng)管配管圖繪制準(zhǔn)繩及請求-山東通風(fēng)管道:http://hwzxw.net
Guidelines and Requirements for Drawing Piping Drawings of Galvanized Iron Air Pipes in Shandong Province-Shandong Ventilation Pipeline: http://hwzxw.net
5) 配管圖應(yīng)按某系統(tǒng)黨樓層鍍鋅鐵皮風(fēng)管制作進(jìn)行繪制,并注明接口位置。
5) Piping diagram should be drawn according to galvanized iron sheet air duct of a party building in a certain system, and the location of the interface should be indicated.
6) 鍍鋅鐵皮風(fēng)管制作制作時(shí)以配管圖為依據(jù)下達(dá)作業(yè)票,要求法蘭與鍍鋅鐵皮風(fēng)管制作規(guī)格數(shù)量相配,以求得標(biāo)準(zhǔn)化互換性。
6) When making galvanized iron sheet air duct, the operation ticket is issued on the basis of piping chart, and the flange and galvanized iron sheet air duct are required to match the specifications and quantities in order to achieve standardized interchangeability.
7) 配管圖應(yīng)保存以便存檔管理,未經(jīng)項(xiàng)目經(jīng)理同意不得私自更改配管圖。
7) Pipeline diagrams should be kept for archiving and management. Pipeline diagrams should not be altered without the consent of the project manager.
除了鐵皮風(fēng)管之外,我們還有通風(fēng)設(shè)備等等,想要了解的話,可以咨詢我們!歡迎訪問山東通風(fēng)管道網(wǎng)站:http://hwzxw.net
In addition to iron ducts, we also have ventilation equipment and so on, if you want to know, you can consult us! Welcome to Shandong Ventilation Pipeline website: http://hwzxw.net
上一篇:大家知道通風(fēng)防排煙設(shè)備安裝質(zhì)量要求嗎
下一篇:鍍鋅鐵皮風(fēng)管和復(fù)合風(fēng)管的不同您了解過嗎?
相關(guān)