如何安裝復(fù)合管,保護(hù)成品及你知道嗎?
發(fā)布人:http://hwzxw.net 發(fā)布時(shí)間:2019-07-19 18:52:13
1. 安裝
1. Installation
安裝方法可根據(jù)現(xiàn)場(chǎng)實(shí)際情況確定??烧w吊裝到位,也可先將風(fēng)管逐一放在支架上,再逐一連接。在整體吊裝中,要注意將風(fēng)管接在地面上,其長(zhǎng)度為10 - 12米,不宜過(guò)長(zhǎng)。
The installation method can be determined according to the actual situation on site. It can be hoisted in place as a whole, or it can first place the air ducts on the brackets one by one, and then connect them one by one. In the overall hoisting, first of all, attention should be paid to connecting the air duct to the ground, its length is 10 - 12 meters, not too long.
在風(fēng)道與保護(hù)套管之間,采用柔性材料應(yīng)使用進(jìn)行密封。
Flexible material should be used for sealing between duct and protective sleeve.
管道系統(tǒng)安裝完畢后,應(yīng)嚴(yán)格檢查有無(wú)漏氣。
After installation of the pipeline system, strict inspection should be carried out for air leakage.
山東通風(fēng)管道
Shandong Ventilation Pipeline
2. 成品保護(hù)
2. Protection of finished products
(1)復(fù)合管安裝后,表面應(yīng)平整、干凈,無(wú)雜物。如果是安裝在室外,那么也要做好防雨、防雪的措施。
(1) After the installation of the composite pipe, the surface should be flat and clean, and there should be no impurities. If it is installed outdoors, then it is necessary to do a good job of rain and snow prevention measures.
(2)施工過(guò)程中如需懸掛風(fēng)管系統(tǒng),應(yīng)將風(fēng)管系統(tǒng)的外露部分封閉,防止雜物進(jìn)入。
(2) If the air duct system is to be suspended in the construction process, the exposed part of the air duct system should be closed to prevent the entry of debris.
(3)風(fēng)管不能作為吊架或跳板使用。
(3) The air duct can not be used as a hanger or springboard.
3.措施
3. Safety and environmental protection measures
(1)施工前應(yīng)進(jìn)行檢查,如有問(wèn)題應(yīng)及時(shí)處理。
(1) Inspection should be carried out before construction, and problems should be dealt with in time.
如果你想在高空工作,請(qǐng)系好帶,不要向空中扔?xùn)|西。
If you want to work at high altitude, please fasten your seat belt and don't throw things into the air.
(3)懸掛風(fēng)管時(shí),禁止直接站在其下。吊車應(yīng)先試車,無(wú)問(wèn)題后吊裝。
(3) When hanging an air duct, it is forbidden to stand directly under it. The crane should be tested first and hoisted after no problems.
(4)作業(yè)現(xiàn)場(chǎng)應(yīng)配備防護(hù)裝置和消防設(shè)備,確保。
(4) Work site shall be equipped with safety protection devices and fire fighting equipment to ensure safety.
以上是山東通風(fēng)管道廠家為大家整理的相關(guān)內(nèi)容,想要了解更多內(nèi)容,歡迎訪問(wèn)網(wǎng)站:http://hwzxw.net
The above is the related content of Shandong Ventilation Pipeline Factory for you. For more information, please visit the website: http://hwzxw.net.