凈化處理通風管道的制做與安裝

發(fā)布人:http://hwzxw.net   發(fā)布時間:2022-05-23 17:28:08

針對凈化處理通風管道怎么制作與安裝?下邊由通風管道的技術(shù)工作人員介紹一下:

How to make and install the ventilation duct for purification treatment? The following is an introduction by the technical professional staff of the ventilation duct:

施工準備(包含機械設(shè)備、器材查驗;隊組施工工藝、技術(shù)交底;了解工程圖紙等)→板才查驗、工程驗收→原材料清理、油漬→施工放樣、開料→制做壓槽(折方)清理壓槽油漬→制做風管半成品加工→表面油漬臟物→鉚合成形再清理風管內(nèi)外表面→查驗工程驗收→封閉式支管→進庫儲放待裝。

Construction preparation (including inspection of mechanical equipment and equipment; team construction process and safety technical disclosure; understanding of engineering drawings, etc.) → plate inspection and engineering acceptance → cleaning and eliminating oil stains of raw materials → construction setting out and cutting → making pressure groove (folding) and cleaning oil stains of pressure groove → making semi-finished products of air duct → eliminating oil stains and dirt on the surface → riveting and forming, and then cleaning the inner and outer surfaces of air duct → inspection and acceptance of Engineering → closed branch pipe → warehousing and storage for installation.

20170427487014.jpg

施工準備→起吊制做(包含開料、矯直、成型、防銹處理刷油等)→當場起吊布局→半成品加工運到當場拼裝間→風管拼裝(包含清理達標的閥構(gòu)件)→封閉式端口號測量穿管(再按制做工藝流程制做穿管)→運到當場拼裝成封閉系統(tǒng)。

Construction preparation → hoisting and fabrication (including material cutting, straightening, forming, rust prevention treatment, oil painting, etc.) → hoisting and layout on the spot → processing and transporting semi-finished products to the on-site assembly room → air duct assembly (including valve components that meet the standard) → closed port number measurement and threading (and then making threading according to the manufacturing process) → transporting them to the on-site assembly room to form a closed system.

空調(diào)凈化安裝設(shè)備施工工序施工準備(包含了解工程圖紙、隊組技術(shù)交底、機器原材料提前準備等)→基本工程驗收、進行復(fù)測、調(diào)整、解決→機器設(shè)備拆箱、核對、查驗、工程驗收→清洗機械→起重吊裝、到位、地面找平、找正→機器設(shè)備穿管的制做、安裝(按凈化處理風管的制做、安裝工藝流程開展)→機器設(shè)備試運行→設(shè)備帶負載運作調(diào)節(jié)→工程驗收。

Construction preparation for construction process of air conditioning purification installation equipment (including understanding engineering drawings, team safety technical disclosure, advance preparation of machine raw materials, etc.) → basic engineering acceptance, retesting, adjustment and solution → unpacking, checking, inspection and engineering acceptance of machinery and equipment → cleaning machinery → hoisting, in place, ground leveling and alignment → fabrication and installation of machinery and equipment through pipes Installation (according to the manufacturing and installation process flow of purification treatment air duct) → trial operation of machinery and equipment → adjustment of equipment with load operation → project acceptance.

本文的精彩內(nèi)容由濟南通風管道提供知識提供,本網(wǎng)站還有很多的精彩內(nèi)容,更多的內(nèi)容您可以點擊進入:http://hwzxw.net我們有專門的客服為您解答問題

The wonderful content of this article is provided by Jinan ventilation duct. There are many wonderful contents on this website. You can click to enter more contents: http://hwzxw.net We have special customer service to answer your questions