水菜丽加勒比av在线播放-国产精品一区二区三区综合-国产精品一区二区久久不-欧美国产精品亚洲精品观看

當(dāng)前位置:首頁-新聞中心新聞中心

白鐵皮人工的加工要求標(biāo)準(zhǔn)您清楚嗎?

發(fā)布人:http://hwzxw.net   發(fā)布時間:2017-10-26 17:03:28

1.使用白鐵加工壓口機時不要用力推動鐵皮。壓橫接號應(yīng)先將咬口部分鏟掉。手離壓輪要大于20毫米。

1. the use of tin processing pressure machine don't push iron. The horizontal connection number should be first removed from the bite part. Hand off pressure roller is greater than 20 mm.

使用咬口機要將白鐵皮的咬口處對好后再開車。開車時工件要扶穩(wěn),手指不得放在咬口機軌道上。

Use the bite holder to bite the iron sheet properly and then drive it again. When driving, the workpiece should be stable, and the finger should not be placed on the rail of the bite machine.

2.滾床的齒輪必須加防護套罩。使用時應(yīng)離開兩壓輥的縫隙,并宜在進料處加擋板。

2. gear hobbing machine must be combined with a protective cover. When using, the gap between the two rollers should be left, and the safety baffle should be added at the feeding place.

使用白鐵加工剪板機,上刀架不得放置工具等物品。調(diào)整鐵皮時腳不能放在踏板上。剪切時禁止把手伸入壓板空隙中。

The use of tin processing shears, tools and other items shall not be placed on the knife. The feet should not be placed on the pedals when adjusting the iron sheet. When cutting, don't put the handle into the gap of the press plate.

3.進行錫焊時要戴手套,不許仰焊。熔錫時錫液不許著水,防止飛濺。使用的電烙鐵及鹽酸要妥善保管。

To wear gloves 3. soldering, no overhead welding. Tin bath is not allowed to splash water and prevent spatter. Proper use of electric iron and hydrochloric acid should be kept in good order.

QQ截圖20170428145456.png

4.操作電鉆和半自動螺絲刀時,要垂直于白鐵加工的鐵皮,旦不要用力過猛。使用點焊機要檢查有無漏電漏水現(xiàn)象,操作時要戴焊工手套、鞋蓋、墨鏡等防護用品,冬季使用后要放盡冷卻液。

4. the operation of electric drill and semi-automatic screwdriver, perpendicular to the processing of tin tin, Dan do not overexert. Use spot welding machine to check whether there is leakage or leakage, and wear protective gloves such as welder gloves, shoes cover, sunglasses and so on. The cooling liquid should be put out after use in winter.

5.在保溫層外包白鐵皮時,要扎好衣袖、褲腳、袖口,戴好口罩、防塵帽和防護眼鏡。

5. in the insulation layer outsourcing tin, to tie the sleeves, trousers, cuffs, wearing masks, protective glasses and dust cap.

6.吊運風(fēng)管及材料時,索具要拴牢,并應(yīng)加溜繩穩(wěn)住。用麻繩滑車吊運時拉繩人要戴帽。

6. lifting air pipes and materials, rigging should be fastened ropes, and should be added. With a rope pulley hanging rope to wear a helmet.

7.不要在未固定的風(fēng)管、架空的鐵皮上站立和行走。

7. do not stand and walk on the unfixed air pipe and the aerial iron sheet.

8.廢棄的邊角余料要及時清理,防止刺傷手腳。

8. waste leftover materials should be cleaned in time to prevent stab wounds.


上一篇:順發(fā)黑白鐵加工技術(shù)越來越強
下一篇:工廠房在通風(fēng)管道的使用上有什么特點?

網(wǎng)站首頁 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們

高唐县| 洛阳市| 绥德县| 湘潭县| 东莞市| 桑日县| 三江| 青海省| 昌都县| 九龙坡区| 高青县| 平和县| 南投市| 日喀则市| 茂名市| 汾西县| 筠连县| 河北省| 乌兰浩特市| 拉孜县| 永春县| 平南县| 正安县| 唐海县| 沁源县| 凤城市| 鹤岗市| 抚顺县| 靖江市| 建昌县| 喀喇沁旗| 慈溪市| 巴彦淖尔市| 开封市| 邵阳市| 绥棱县| 尉犁县| 博爱县| 巨鹿县| 封开县| 民和|