水菜丽加勒比av在线播放-国产精品一区二区三区综合-国产精品一区二区久久不-欧美国产精品亚洲精品观看

當(dāng)前位置:首頁-新聞中心新聞中心

對通風(fēng)管道雜質(zhì)清理的方式都有哪些??

發(fā)布人:http://hwzxw.net   發(fā)布時間:2020-02-27 16:29:27

(1)風(fēng)道與風(fēng)機(jī)連接時,進(jìn)、出風(fēng)口應(yīng)安裝軟接頭。軟接頭的截面尺寸應(yīng)與風(fēng)機(jī)進(jìn)出口截面尺寸一致。軟管連接可由帆布、人造革和其他材料制成。軟管長度不應(yīng)小于200,并應(yīng)適當(dāng)擰緊。軟管可以緩沖風(fēng)扇的振動。

  (1) When the air duct is connected with the fan, soft joints shall be installed at the air inlet and outlet. The section size of soft joint shall be consistent with that of fan inlet and outlet. Hose connections can be made of canvas, leatherette and other materials. The hose length shall not be less than 200 and shall be properly tightened. The hose dampens the vibration of the fan.

  (2)風(fēng)管與除塵設(shè)備、加熱設(shè)備連接后,根據(jù)理論映射圖安裝好設(shè)備后,應(yīng)暫停預(yù)制安裝。

  (2) After the air duct is connected with the dedusting equipment and heating equipment, the prefabricated installation shall be suspended after the equipment is installed according to the theoretical mapping diagram.

  (3)濟(jì)南風(fēng)管安裝時,風(fēng)管預(yù)制好后,應(yīng)打開進(jìn)、出口。如果需要在安裝結(jié)束時打開管道,則連接應(yīng)緊密。

濟(jì)南通風(fēng)管道

  (3) When Jinan air duct is installed, the inlet and outlet shall be opened after the air duct is prefabricated. If it is necessary to open the pipe at the end of installation, the connection shall be tight.

  (4)輸送高含水率凝結(jié)水或氣體時,水平管道應(yīng)設(shè)置在斜坡處,并在低處與排水管連接。安裝時風(fēng)管底部不應(yīng)有縱向接縫,底部接縫處應(yīng)懸掛密封處理。

  (4) When transporting condensate or gas with high moisture content, the horizontal pipeline shall be set at the slope and connected with the drainage pipe at the low position. During installation, there shall be no longitudinal joint at the bottom of the air duct, and the bottom joint shall be hung for sealing.

  (5)輸送易燃易爆氣體的鋼板風(fēng)道,在風(fēng)道連接法蘭處安裝跳線,并與靜電接地網(wǎng)連接。

  (5) For the steel plate air duct conveying inflammable and explosive gas, install jumpers at the connecting flange of the air duct and connect with the electrostatic grounding grid.

  (6)水平風(fēng)道高度在4m以上時,安裝人員應(yīng)系好帶。腳手架或活動支架上的跳板應(yīng)固定,跳板寬度應(yīng)符合規(guī)范,腳手架上的設(shè)備人員應(yīng)隨身攜帶物品袋,避免物品或電鉆等掉落傷人。

  (6) When the height of horizontal air duct is more than 4m, the installation personnel shall fasten the safety belt. The springboard on the scaffold or movable support shall be fixed, and the width of the springboard shall meet the safety specifications. The equipment personnel on the scaffold shall carry the bag with them to avoid personal injury caused by falling objects or electric drills.

  (7)雙臂臂架在風(fēng)洞內(nèi)就位后,叉骨要直,臂架不要換,雙臂臂架受力均勻。

  (7) After the double arm boom is in place in the wind tunnel, the fork bone shall be straight, the boom shall not be replaced, and the force on the double arm boom shall be uniform.

  以上就是濟(jì)南通風(fēng)管道對雜質(zhì)清理的方式的詳細(xì)介紹,想要了解更多請點(diǎn)擊官網(wǎng)http://hwzxw.net

  The above is a detailed introduction to the cleaning methods of impurities in Jinan ventilation pipeline. For more information, please click http://hwzxw.net


上一篇:對通風(fēng)管道雜質(zhì)清理的方式都有哪些??
下一篇:通風(fēng)管道的鑒定標(biāo)準(zhǔn)都有哪些?

網(wǎng)站首頁 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們

邮箱| 茌平县| 策勒县| 新田县| 镇平县| 武陟县| 武宁县| 吉木萨尔县| 秀山| 揭西县| 昌江| 中阳县| 米林县| 台南市| 淮安市| 来安县| 民权县| 赤水市| 香河县| 抚顺市| 兰西县| 厦门市| 镇巴县| 凤凰县| 铜梁县| 班玛县| 香格里拉县| 东乌珠穆沁旗| 广水市| 青州市| 本溪市| 华池县| 遂平县| 聊城市| 凌海市| 万盛区| 丹东市| 翁源县| 房产| 崇左市| 新竹县|